Engineering design and construction plans for turning lanes on WV 73 for the Fountain Place Development near Logan. Plans consisted of typicals, plans, cross-sections and maintenance of traffic.
Value engineering for Ramp 1, US 35 - WV 34 Interchange, saving $3,000,000 in construction costs.
Structural Engineering for the replacement of a 100’-0" bridge and roadway design for the approaches and construction detour. Project included roadway design, drainage, and maintenance of traffic and ...
more
Structural Engineering for the replacement of a 72’-0" bridge and roadway design for the approaches and construction detour. Project included roadway design, drainage, and maintenance of traffic and ...
more
TERRADON was selected by the West Virginia Division of Highways to provide compete design of widening and improvements to 2.19 miles of Corridor G, US 119 in Kanawha County. This is an area that rapid ...
more