Transportation Engineering

 
more projects related to Transportation Engineering
 

Fountain Place - WV 73 Turning Lanes

Engineering design and construction plans for turning lanes on WV 73 for the Fountain Place Development near Logan. Plans consisted of typicals, plans, cross-sections and maintenance of traffic.

US 35 Value Engineering

Value engineering for Ramp 1, US 35 - WV 34 Interchange, saving $3,000,000 in construction costs.

Sleeths Run Bridge CR119/1

Structural Engineering for the replacement of a 100’-0" bridge and roadway design for the approaches and construction detour. Project included roadway design, drainage, and maintenance of traffic and ... more

Sedalia Arch Bridge

Structural Engineering for the replacement of a 72’-0" bridge and roadway design for the approaches and construction detour. Project included roadway design, drainage, and maintenance of traffic and ... more

West Virginia Corridor G Widening

TERRADON was selected by the West Virginia Division of Highways to provide compete design of widening and improvements to 2.19 miles of Corridor G, US 119 in Kanawha County. This is an area that rapid ... more